Project Status

Project

Details

Batch/

Production Run

Progress in %

Status

Availability

Original delivery target

Revised delivery target

Comments

WDM2 RTR

Ready to WDM2, in STD DC and DCC Silent, Premium DC and DCC Sound versions

2nd

5%

On Schedule

Available

31 December 2026

N/A

 

Early-stage bookings are ongoing.

WAP7 & WAG9 RTR

Ready to run WAP7 and WAG9, in STD DC and PRM DC, DCC Silent and DCC Sound versions

4th

5%

On Schedule

Available

31 December 2026

N/A

 

Early-stage bookings are ongoing.

Electric Train Sets and Packs

Train Sets (with tracks and controllers) and Train packs (without tracks and controllers) led by either a WAP7 or a WAG9

3rd

5%

On Schedule

Available

31 December 2026

N/A

Early-stage bookings are ongoing.

Deccan Queen RTR Sets

RTR WCM5, Deccan Queen specific non-AC chair cars, Dining Cars and SLR

Pilot/1st

35%

On Schedule

Available

30 Oct 2026

N/A

Our development, prototyping and procurement activities are on track

ICF Shatabdi

Train packs, train sets and individual coaches of various Shatabdi configurations

Pilot/1st

30%

Delayed

Available

30th June 2026

31 August 2026

Our development, prototyping, and procurement activities are on track; however, previous project delays couldn't be absorbed on time.

ICF Rajdhani

Train packs, train sets and individual coaches of various Rajdhani configurations

Pilot/1st

40%

Delayed

Sold Out

30th June 2026

15 August 2026

Delays in the previous projects have pushed the activities of this project, and the designs required more revisions than anticipated in the design phase.

ICF AC Coaches

STD and PRM AC ICF coaches – AC 1st, 2nd and 3 tier coaches

Pilot/1st

80%

Delayed

Sold Out

31 March 2026

30 June 2026

Delays in the previous projects have pushed the activities of this project.

Diesel Train Sets and Packs

Train Sets (with tracks and controllers) and Train packs (without tracks and controllers) led by a WDM2

Pilot/1st

100%

PROJECT DELIVERED

Sold Out

31 January 2026

15 April 2026

Since our diesel train pack is led by WDM2, delay in the WDM2 project has pushed this project back as well. We are expecting to close both together.

WDM2 RTR

Ready to WDM2, in STD DC and DCC Silent, Premium DC and DCC Sound versions

Pilot/1st

100%

PROJECT DELIVERED

Sold Out

31 January 2026

15 April  2026

This is our very first production run of WDM2, so challenges were expected; however, we did quite well till December. However, since then we have lost a shipment of important component and 3 other components have been delayed. WE ARE STILL AWAITING DELIVERY OF SOME KEY COMPOENENTS FROM VENDORS AS OF 20 FEB 2026.

Electric Train Sets and Packs

Train Sets (with tracks and controllers) and Train packs (without tracks and controllers) led by either a WAP7 or a WAG9

2nd

100%

PROJECT DELIVERED

Sold Out

31 January 2026

28 February 2026

Our second production batch of Train Sets and train packs have concluded in most parts except for accessories provided for train sets like tracks and controllers due to sourcing delays.

WAP7 & WAG9 RTR

Ready to run WAP7 and WAG9, in STD DC and PRM DC, DCC Silent and DCC Sound versions

3rd

100%

PROJECT DELIVERED

Sold Out

31 January 2026

N/A

Our 3rd production batch of WAP7 and WAG9 models have been delivered. Most customers who placed pre-orders have received their models, except those who have clubbed orders with other production/made to order.